Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, Walney Offshore Wind Farm, Year 3 Post-construction Monitoring

2014, Walney Offshore Wind Farm, Year 3 Post-construction Monitoring

Top Categories:

Benthic Ecology
Birds

Description

This series contains a collection of surveys undertaken as part of the year 3 post-construction monitoring programme for the Walney offshore wind farm development. Surveys completed include ornithological and benthic.

Dataset

Download All

2014, Walney Offshore Wind Farm, Year 2 Post-construction Monitoring, Ornithological Survey Data (CMACS 2014)

Report

Download All

Benthic Survey (CMACS, 2014)

Ornithological Surveys using High-resolution Imagery (Dept. of Bioscience, Univ. of Aarhus, 2014)

Boat-based Bird Monitoring Report (NIRAS, 2015)

Weekly peak counts of Pink-footed Geese and Whooper Swans at WWT Martin Mere, Lancashire, September - December Counts Reports (WWT Consulting, 2015)

Turbine Colonisation Survey, Technical Report (CMACS, 2014)

Boat-based Ornithological Survey Report (CMACS, 2014),

Consolidated Annual Monitoring Report (NIRAS, 2015)