2008, Osiris Projects, Walney Offshore Wind Farm, Hydrographic and Geophysical Survey

2008, Osiris Projects, Walney Offshore Wind Farm, Hydrographic and Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2007 - April 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

On the instructions of RPS Environmental Consultancy acting under the instructions of
DONG Energy, Osiris Projects were commissioned to carry out a hydrographic and
geophysical survey covering the proposed Walney offshore wind farm site, 9 miles
west of Walney Island, Cumbria. The aims of the survey were to provide a
comprehensive overview of seabe...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
4