Summary
CT Offshore carried out a comprehensive seabed survey of the export cable route connecting the Walney 1 and 2 wind farm to shore. Walney 1 and 2 surveys have been carried out separately, but as managed by DONG, the two surveys have been included in the same series here on the Marine Data Exchange.