Summary
In November 2012 EGS (International) Ltd was contracted to undertake the second post construction (6 month) survey of the wind farm. The aim of the survey was to identify changes to seabed morphology within the wind farm and along the export cable routes. To meet the requirements of the survey EGS operated a Kongsberg EM3002D high frequency multibe...