2008-2010, Walney Offshore Wind Farm, Pre-construction Monitoring

2008-2010, Walney Offshore Wind Farm, Pre-construction Monitoring

Topic categories:

Birds

Epifauna and Fish

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2008 - Dec 2010

Development:

Walney

Publication date:

May 2021

Round:

2

Organisation:

Walney Offshore Wind Farm

Phase:

Pre-construction

Description

Walney Offshore Windfarm (WOW) is located in the East Irish Sea and has been con-structed in two stages, Walney 1 and Walney 2. Export cable 1 runs into Morecambe Bay and connects to a transformer station at Heysham. Export cable 2 comes ashore at Cleveleys and connects to a transformer station at Hillhouse, Stanah. The construction of Walney Offshore Windfarms will commence in February 2010. Pre-construction surveys were conducted from 2008 and ongoing into 2010.
The document within this series describes the environmental monitoring undertaken pre construction of Walney 1 and 2 and export cable routes 1 and 2. The environmental monitoring reported in this document should be seen as an ongoing process of monitoring pre-, during and post construction monitoring. Monitoring activities will be reported annually to the licensing authority, as described in the Marine Licence, for a period up to three years post-construction. The technical reports from the monitoring surveys are also provided within this series.