2014, EGS, Walney Offshore Wind Farms, March Post-Construction Monitoring Survey

2014, EGS, Walney Offshore Wind Farms, March Post-Construction Monitoring Survey

Top Categories:

Geophysical

Description

EGS International Ltd (EGSi) were contracted to undertake a post-construction survey of a
number of selected turbines, one substation and several array cables within WOW 1 & 2.
The aim of the survey was to assess the extent of any changes to seabed and scouring
around the turbine monopiles and the substation compared to the previous surveys within
the windfarm and also to identify any exposures along several array cables.

Dataset

Download All

Side Scan Sonar Mosaics

Processed Bathymetry Data

Report

Download All

Survey Report

Appendices

Charts

Client Representative Close Out Report (Cathie Associates, 2014)