Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2016, Fugro Emu Limited, Walney Offshore Wind Farm, Post Construction Survey 1

2016, Fugro Emu Limited, Walney Offshore Wind Farm, Post Construction Survey 1

Topic categories:

Geophysical

All datasets and reports

All

|

Datasets

|

Reports

Packages (9)

Dataset

Contour Shapefiles


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
6.33 MB
Report

Interpretative Reports


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

296.69 MB
Dataset

Interpretative Shapefiles


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
11.34 KB
Dataset

RV Discovery Bathymetry Data (Export Cables)


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
6.27 GB
Report

RV Discovery Mobilisation and Calibration Report


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to unde...

10.28 MB
Dataset

RV Discovery Operations Report Data


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
80.76 MB
Dataset

Sound Velocity Profiles


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
78.82 KB
Report

Valkyrie Mobilisation and Calibration Report


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

12.38 MB
Dataset

Valkyrie Operations Report Data


Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to under...

Start and end date

Apr, 2016

 - 

May, 2016
37.82 MB

Select a Package to see more information about it