2013, EGS, Walney, Post-Construction Monitoring Survey (June-July)

2013, EGS, Walney, Post-Construction Monitoring Survey (June-July)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2026

Collection date:

June 2013 - July 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In June 2013 EGS (International) Ltd was contracted to undertake the third post construction (6 month) survey of the windfarm. The operations involved monitoring changes to seabed morphology around the turbines and substations as well as along the inter array cable and export cable routes. EGSi carried out the survey using a high frequency multibea...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
6
Reports
3