2012, Titan, Burbo Bank Extension, Inshore Geophysical Survey

2012, Titan, Burbo Bank Extension, Inshore Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2012 - January 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Gardline Geosurvey were commissioned by Dong Energy Burbo Bank Extension (UK) Ltd to survey the proposed Burbo Bank Extension Inshore Area. This work was undertaken by Titan Environmental Surveys Ltd between 04-Jan and 14-Jan-2012. The geological data acquisition programme was carried out by MV Titan Voyager, which sailed from Conwy and returned to...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
2