2013-2014, Fugro, Walney Extension, Geotechnical Site Investigation

2013-2014, Fugro, Walney Extension, Geotechnical Site Investigation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

January 2025

Collection date:

September 2013 - June 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Cathie Associates were contracted by DONG as Clients Representative for a geotechnical survey for the Walney Wind Farm Extension project. The survey works initially consisted of utilising 3no. vessels: > Fugro Commander - Seabed CPTs > Fugro Excalibur - Shallow water CPTs and sampling / coring > Fugro Gargano - Deep water downhole CPTs and...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
2
Reports
5