2012-2013, Fugro Alluvial Offshore Limited, Walney Extension Offshore Wind Farm, Cable Route, Geotechnical Site Investigation

2012-2013, Fugro Alluvial Offshore Limited, Walney Extension Offshore Wind Farm, Cable Route, Geotechnical Site Investigation

Top Categories:

Geotechnical

Description

A ground investigation has been carried out by Fugro Alluvial Offshore Limited (FAOL) on the
instructions of DONG Energy Power (UK) Limited (DONG) for the development of the Walney
Extension offshore windfarm site in the Irish Sea. The site is located between approximately 21 km to
45 km west of the Isle of Walney and the west coast of Cumbria in the Irish Sea. The Walney
Extension windfarm site is adjacent to the Walney Phase 1 and Phase 2 windfarm sites to the north
and the north-east.
The ground investigation was carried out from 13 October 2012 to the 12 January 2013 on the
geotechnical drill ship Fugro Commander and the jack-up barge the Excalibur.

Dataset

Download All

AGS Data

Report

Download All

2012-2013, Fugro Alluvial Offshore Limited, Walney Extension Offshore Wind Farm, Geotechnical Site Investigation, Part C Field Operations Report

2012-2013, Fugro Alluvial Offshore Limited, Walney Extension Offshore Wind Farm, Geotechnical Site Investigation, Part B Geotechnical Data Report