N-Sea Survey B.V. (hereinafter referred to as N-Sea) was awarded the contract by DONG Energy Walney
Extension (UK) Ltd. (hereinafter referred to as DONG) to undertake geotechnical sampling investigations,
consisting of CPTs (cone penetration tests) and vibrocores at specified locations. Sixty six (66) locations
were identified by DONG: 17 within the WOW03 site and 49 along the proposed export cable route.
Geotechnical services were provided by specialist subcontractor Marine Sampling Holland (MSH) who
provided the Manta CPT, hydraulic vibrocore equipment and four operators. Fieldwork operations were
undertaken from the 32 m multicat, M.P.R. 3, which was chartered from Marine Projects Rotterdam.
A total of 79 CPTs (including 13 repeats) and 76 vibrocores (incl. 10 repeats) were completed between
20 September and 5 October 2013. The approximate water depths ranged from -3 m LAT near shore to
+48 m LAT at the WOW03 site. Various seabed features, including mega ripples and sand waves, were
present on the seabed.

Dataset

Download All

2013, N-Sea Survey BV, Walney Extension Offshore Wind Farm, Cable Route, Geotechnical Investigation, CPT AGS Data

2013, N-Sea Survey BV, Walney Extension Offshore Wind Farm, Cable Route, Geotechnical Investigation, VC Photographs

2013, N-Sea Survey BV, Walney Extension Offshore Wind Farm, Cable Route, Geotechnical Investigation, Final Lab Schedule for Offshore Vibrocores

Report

Download All

Factual Results Report

Vibrocore Field Logs

Scope of Work

Report Part C (Field Operations)

Daily Progress Reports