Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2010, DONG Energy, Walney Extension, Environmental Impact Assessment Scoping

2010, DONG Energy, Walney Extension, Environmental Impact Assessment Scoping

Top Categories:

Birds
Geophysical
Marine Mammals
Meteorology
+ 1 More

Description

This Scoping Report sets out the proposed content, methodologies and key issues to be included in the Environmental Impact Assessment (EIA) and the resulting ES to be submitted with the DCO application. The purpose of this document is to support a request for a scoping opinion for an EIA from the IPC. It is also intended that this report builds upon consultation carried out to date and supports ongoing consultation with statutory and non-statutory consultees and stakeholders on the scope of the EIA required for the Walney Extension offshore wind farm. The Scoping Report is structured in sections relating to principal topic areas, providing an overview of the project, the developer, and the assessment and consents process by way of an introduction section (Chapter 1), a description of the project (Chapter 2), the scoping of environmental offshore and onshore impacts with summary tables of potential impacts (Chapter 3), and finally an overview of the consultation process and the probable dates of the various steps leading to the grant of the DCO and subsequent construction and operation (Chapter 4). Within Chapter 3 (Scoping of Environmental Impacts), specific topics are arranged within categories of physical, biological, human offshore environments and onshore environments. Each of these subsections presents a description of baseline conditions from field and survey work followed by an assessment of potential impacts and the studies and surveys proposed to address these within the EIA.

Report

Download All

2010, DONG Energy, Walney Extension, Environmental Impact Assessment, Infrastructure Planning Commission Scoping Opinion

Report