2012, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)

2012, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2012 - November 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Fugro Alluvial Offshore Limited (FAOL) was requested by Dong Energy Power (UK) Limited to perform a
geotechnical investigation at the site to provide soils information to assist in the design and installation of a
cable route.

The work was performed from the Fugro Commander from 25 October to 16 November 2012 in accordance with
instructions receiv...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
2