2014, Anatec Limited, Walney Extension Offshore Wind Farm, Shipping and Fishing Review

2014, Anatec Limited, Walney Extension Offshore Wind Farm, Shipping and Fishing Review

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

August 2013 - March 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Anatec have been commissioned by Cathie Associates to analyse the shipping and fishing activity in the area surrounding the Walney Extension Offshore Wind Farm and its export cable system, located off the North West coast of England.

Categories:
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1