2016, Cathie Associates, Walney Extension, Cable Burial Risk Assessment

2016, Cathie Associates, Walney Extension, Cable Burial Risk Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2026

Collection date:

November 2016 - November 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

A burial risk assessment has been completed for the export cable route and the infield cables planned for the extension of the Walney Wind Farm. There are to be two Export cables, one from each OSP to transmit the power from the wind farm to shore, 87 No. inter array cables and an interlink cable connecting the twoOSPs. The cable route length forWO...

Categories:
Engineering Design
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1