2014, Fugro Alluvial Offshore Limited, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation (Array Cables and Export Cable Route)

2014, Fugro Alluvial Offshore Limited, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation (Array Cables and Export Cable Route)

Topic categories:

Geotechnical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2014 - Sep 2014

Development:

Burbo Bank Extension

Publication date:

May 2021

Round:

1&2 Extensions

Organisation:

Fugro Alluvial Offshore Limited

Phase:

Pre-construction

Description

At the request of DONG Energy Burbo Extension (UK) Limited. (DONG), Fugro Alluvial Offshore Limited (FAOL) were contracted to perform a geotechnical site investigation. The investigation was to aid in the development of the extension to the Burbo Bank offshore wind farm. The shallow geotechnical site investigation was performed by FAOL using the MV...