2012, 6 Alpha, Walney Extension, UXO Assessment and Risk Mitigation Strategy

2012, 6 Alpha, Walney Extension, UXO Assessment and Risk Mitigation Strategy

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2012 - April 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

 DONG Energy has commissioned 6 Alpha Associates Limited (“6 Alpha”) to conduct a detailed desk based Unexploded Ordnance (UXO) threat and risk assessment study for the Walney Extension Offshore Wind Farm Project. The scope of this study will include operations involved with the installation of turbines and inter-array cables in the Main Array Site...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports