2013, DONG Energy, Walney Extension, Local Impact Report

2013, DONG Energy, Walney Extension, Local Impact Report

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

November 2013 - December 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

On the 28th June 2013, DONG Energy submitted an application for a Development Consent Order (DCO) to the Planning Inspectorate (PINS) to build and operate an extension to the Walney Offshore Wind farm, comprising a maximum number of 207 turbines with a total generating capacity of up to 750 megawatts (MW). Lancashire County Council and Lancaster Ci...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1