2014-2016, Ordtek, Walney Extension, Unexploded Ordnance (UXO) Studies

2014-2016, Ordtek, Walney Extension, Unexploded Ordnance (UXO) Studies

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2026

Collection date:

August 2014 - April 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Ordtek Limited has been appointed as the unexploded ordnance (UXO) risk management consultant  to DONG Energy DE) for the Walney Extension Offshore Wind Farm project. This package contains a range of UXO risk management documents, including technical notes and reports.

Categories:
Geophysical
Unexploded Ordnance
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
4