2005, Pager Power, West of Duddon Sands, Communications Link Survey and Analysis

2005, Pager Power, West of Duddon Sands, Communications Link Survey and Analysis

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2005 - December 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Scottish Power, based in Glasgow, is proposing the development of West Duddon
offshore wind farm, located approximately 14km west-south-west from the coastline
of Walney Island.
Two HRL / Centrica Microwave links have been identified that cross through the
proposed development.
Pager Power has been invited to analyse the link ends and determine exc...

Categories:
Engineering Design
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1