2007, DONG Energy, Westermost Rough, Onshore Cable Route (Possible Constraints - Note)

2007, DONG Energy, Westermost Rough, Onshore Cable Route (Possible Constraints - Note)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2007 - October 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project describes the possible constraints along the planned onshore cable route in relation to the Westermost Rough offshore wind farm. The project was undertaken by Dong Energy in 2007. The project is a desk based study based on maps and web-based information. The project considers various areas likely to be impacted including geology, water...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1