Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2009, DONG Energy, Westermost Rough, Environmental Statement

2009, DONG Energy, Westermost Rough, Environmental Statement

Top Categories:

Benthic Ecology
Birds
Epifauna and Fish
Geophysical
+ 4 More

Description

This Environmental Statement has been
prepared for Westermost Rough Ltd. to
support its application for consent, licenses,
permissions etc. for the construction
of an offshore windfarm in the North Sea
off the Yorkshire coast at Tunstall, with associated
onshore works in East Riding of
Yorkshire County.
The aspiration has been to prepare a clear
and concise Environmental Statement,
which nevertheless provides a sufficiently
detailed description of the construction
and impacts. Consequently, large amounts
of background information, survey results
and data have been structured as annexes
to the report.  They are all provided in this series, along with a revised addendum to the Environmental Statement published in 2012.

Dataset

Download All

Geophysical Assessment, GIS Data (Maritime Archaeology Ltd., 2013)

Appendices B, C and F (Titan 2009 Benthic Survey - CSO234)

Report

Download All

Geophysical Assessment Report (Maritime Archaeology Ltd., 2013)

Marine Mammal Cumulative Impact Assessment (Natural Power Ltd., 2012)

Marine Mammal Cumulative Impact Assessment: Amended Quantitative Piling Assessment for Permanent Threshold Shift (PTS) in Seals (Natural Power Ltd., 2013)

Revised Addendum to Environmental Statement (2012)

Revised Written Scheme of Investigation (2013)

Annexes

Main Document

Environmental Review (Royal Haskoning, 2007)

HR Wallingford Review of Potential Impacts on Spurn Head (2012)

Non-Technical Summary