Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, DONG Energy, Westermost Rough, Additional Electromagnetic Field Evidence

2015, DONG Energy, Westermost Rough, Additional Electromagnetic Field Evidence

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2015 - Aug 2015

Development:

Westermost Rough

Publication date:

May 2021

Round:

1

Organisation:

DONG Energy

Phase:

Post-construction

Description

The document within this series provides additional evidence in relation to the burial depth of the array and export cables at the Westermost Rough Offshore Wind Farm, and the potential effects of a reduction in burial from the electromagnetic fields that are produced from them during operation. The report is a desk-based assessment the aim of whic...