2012-2018, Jon Ford Environmental, Westermost Rough, Ornithological Surveys

2012-2018, Jon Ford Environmental, Westermost Rough, Ornithological Surveys

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

September 2012 - May 2018

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Westermost Rough Offshore Wind Farm project is located in the Greater Wash Strategic Environmental Assessment (SEA) area, approximately 8 kilometres off the Holderness coast of East Yorkshire. The Westermost Rough Offshore Wind Farm extends over an area of 35 sq. km. The boat-based ornithological surveys reported here were carried out between S...

Categories:
Birds
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
6