Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013-2016, DONG Energy Power (UK) Ltd., Westermost Rough Offshore Wind Farm, Metocean Survey

2013-2016, DONG Energy Power (UK) Ltd., Westermost Rough Offshore Wind Farm, Metocean Survey

Topic categories:

Metocean

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2013 - Jul 2016

Development:

Westermost Rough

Publication date:

May 2021

Round:

1

Organisation:

DONG Energy Power (UK) Ltd.

Phase:

Post-construction

Description

In July 2013 two
OCEANOR Seawatch Midi wave buoys were deployed at the Westermost Rough offshore wind farm site, North-East
England. These buoys are referred to as WMR10 and WMR20.