2012-2013, MMT, Westermost Rough, Geophysical Survey and Anomaly Inspection(0)

2012-2013, MMT, Westermost Rough, Geophysical Survey and Anomaly Inspection(0)

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Dec 2012 - Mar 2013

Development:

Westermost Rough

Publication date:

May 2021

Round:

1

Organisation:

MMT

Phase:

Pre-construction

Description

MMT was contracted by DONG to perform a geophysical survey and anomaly inspection in the planned offshore wind farm Westermost Rough outside the Yorkshire coast, England. The survey area is located about 8 km off the Yorkshire coast, north of Hull, England and is divided in two sections; Export Cables and Inter Array area. The purpose of the survey...