Summary
MMT was contracted by DONG to perform a geophysical survey and anomaly inspection in the planned offshore wind farm Westermost Rough outside the Yorkshire coast, England. The survey area is located about 8 km off the Yorkshire coast, north of Hull, England and is divided in two sections; Export Cables and Inter Array area. The purpose of the survey...