2013, Gardline and Titan, Westermost Rough, Benthic Survey

2013, Gardline and Titan, Westermost Rough, Benthic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2013 - May 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Titan Environmental Surveys Ltd was commissioned by DONG Energy to undertake a
benthic survey for the proposed Westermost Rough Offshore Wind Farm (OWF) and
Export Cable Route. The proposed OWF site is a Round 2 wind farm
project and is situated approximately 8 km off the Yorkshire coast.  The scope of work addresses the requirements to monitor ben...

Categories:
Benthic Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
9