2012-2013 Costa Head, Osiris Geophysical Survey

2012-2013 Costa Head, Osiris Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wave

Collection date:

Aug 2012 - Sep 2013

Development:

Costa Head

Publication date:

May 2021

Organisation:

Costa Head

Phase:

Pre-construction

Description

Osiris Projects were commissioned in August 2012 by SSE Renewables, Costa Head
Wave Farm Ltd and Brims Tidal Array Ltd to carry out three contractually separate
geophysical surveys around Orkney, at Costa Head, Westray South and Brims, to
assess the suitability of the locations for the potential installation of wave / tidal
generators, beginning wi...