Summary
A geotechnical survey campaign was undertaken within the vicinity of the Westermost Rough Offshore Wind Farm. This was supported by a preliminary review of acoustic data and assessment for the presence of Annex I reefs to minimise the risk of potential damage to protected features. Following the review of existing data, a drop down video survey pro...