
2014-2018, DONG Energy Power (UK) Ltd., Westermost Rough Offshore Wind Farm, LiDAR Wind Data
Topic categories:
Meteorology
All datasets and reports
All
|Datasets
|Reports
Packages (5)
2014 Data
A WindCube V2 LiDAR was installed on the Westermost Rough offshore at the roof of the substation. Th...
Start and end date
-
Dec, 20142014-2018 Data
On February 2014 a WindCube V2 LiDAR was deployed at the Westermost Rough offshore at the roof of t...
Start and end date
-
Feb, 20182015 Data
A WindCube V2 LiDAR was installed on the Westermost Rough offshore at the roof of the substation. Th...
Start and end date
-
Oct, 2015Documentation Report
On February 2014 a WindCube V2 LiDAR was deployed at the Westermost Rough offshore at the roof of th...
Service and Maintenance Reports
On February 2014 a WindCube V2 LiDAR was deployed at the Westermost Rough offshore at the roof of th...