2012 - 2014, Westermost Rough, Westermost Rough, Environmental Monitoring

2012 - 2014, Westermost Rough, Westermost Rough, Environmental Monitoring

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2012 - December 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Westermost Rough Offshore Wind Farm (WMR OWF) is a project awarded to DONG Energy by The Crown Estate, under the second round of offshore wind licensing agreements (Round 2). The project is located 8km off the Yorkshire coast, just north of Hull. The WMR OWF spans 35 sq. km, within which 35 x 6MW capacity turbines will be installed.
The origina...

Categories:
Benthic Ecology
Birds
Epifauna and Fish
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
2