Summary
A consortium, lead by CMACS, was contracted to carry out a Stage 1 investigation to investigate the following: · The likely EMF emitted from a subsea power cable. · A suggested method to measure EMF in the field, which could be applied by windfarm developers or in future projects. · Guidance on mitigation measures to reduce EMF. · Consideration of ...