Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2006, Barrow Offshore Wind Farm, Onshore Study, Investigation into the Recovery of Cable Installation  in Heysham-Middleton, Lancashire

2006, Barrow Offshore Wind Farm, Onshore Study, Investigation into the Recovery of Cable Installation in Heysham-Middleton, Lancashire

Top Categories:

Onshore

Description

This project examines surveys and assessment of the onshore cable route undertaken on Sunday July 30 2006 and Tuesday August 22 2006.  The fieldwork was carried out to check the site condition.  The surveys concluded that vegetation recovery  was good although in one area the creation of recreational facilities has taken precedence over any botanical and other wildlife interest.

Report

Download All

2006, Barrow Offshore Wind Farm, Onshore Study, Report of Recovery of Cable Installation at Heysham-Middleton, Lancashire