2006, Barrow, Investigation into the Recovery of Cable Installation in Lancashire

2006, Barrow, Investigation into the Recovery of Cable Installation in Lancashire

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

July 2006 - August 2006

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This project examines surveys and assessment of the onshore cable route undertaken on Sunday July 30 2006 and Tuesday August 22 2006.  The fieldwork was carried out to check the site condition.  The surveys concluded that vegetation recovery  was good although in one area the creation of recreational facilities has taken precedence over any botanic...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2006, Barrow, Investigation into the Recovery of Cable Installation in Lancashire


3

Barrow Offshore Wind Farm: Investigation into the Recovery of Cable Installation, 2006