Summary
Forewind Ltd. contracted GEO to conduct a geotechnical site investigation including seabed Piezo-Cone Penetration Testing (CPTU) at the planned Offshore Wind Farm at Dogger Bank. The worksite for the present campaign is primarily Tranche B of Dogger Bank Zone located in the UK part of the North Sea. 80 tests were performed in Tranche B and 8 t...