Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, Forewind, Zone 3 - Dogger Bank, Environmental Statement Creyke Beck

2013, Forewind, Zone 3 - Dogger Bank, Environmental Statement Creyke Beck

Top Categories:

Birds
Epifauna and Fish
Geophysical

Description

In June 2008 The Crown Estate announced proposals for the third round (Round 3)
of offshore wind farm leasing, following on from the 8 gigawatts (GW) planned from
earlier United Kingdom (UK) offshore wind leasing programmes (Rounds 1 and 2).
Subsequent to this announcement, the Offshore Energy Strategic Environmental
Assessment (Department of Energy and Climate Change (DECC) 2009) was carried
out, to examine the potential for 25GW of additional UK offshore wind.
This document constitutes the ES for Dogger Bank Creyke Beck, presenting the
findings of the Environmental Impact Assessment (EIA) process. The ES is
submitted in support of a Development Consent Order (DCO) application and is
required under the Infrastructure Planning Regulations (Environmental Impact
Assessment) Regulations 2009 (which transpose the EIA requirements of the EU
Directive (EIA Directive) 85/337/EEC (as amended by Directive 97/11/EC and
Directive 2003/35/EC)

Report

Download All

Appendices

Reports