Summary
The survey of the Dogger Bank Tranche A area and the associated export cable corridor was undertaken by Gardline Environmental Limited (Gardline) between 07/05/2011 and 30/01/2012. The specific objective of the project was to provide characterisation of benthic ecological conditions specific to the site within the Dogger Bank Offshore Wind Farm Zon...