2014 Zone 3 Dogger Bank Teeside A and B, Forewind, Environmental Statement

2014 Zone 3 Dogger Bank Teeside A and B, Forewind, Environmental Statement

Top Categories:

Archaeology
Benthic Ecology
Epifauna and Fish
Noise

Description

Dogger Bank Teesside A & B, the subject of this ES, are the first and second
projects of the second stage of the Dogger Bank development. Forewind’s
development of the Dogger Bank Zone began with Dogger Bank Creyke Beck
for which planning application was lodged during 2013. Dogger Bank Teesside
A & B will comprise two wind farms, each generating up to 1.2GW, and will
connect to the existing National Grid substation at Lackenby, in Teesside.
Dogger Bank Teesside A & B projects will have a total combined generating
capacity of up to 2.4GW.

Report

Download All

2014 Zone 3 Forewind, Environmental Statement Teeside A and B_Report

2014 Zone 3 Forewind, Environmental Statement Teeside A and B_Appendices