2002 - 2005, Vestas KBR, Barrow, Environmental Management Plan

2002 - 2005, Vestas KBR, Barrow, Environmental Management Plan

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2023

Collection date:

January 2002 - May 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This Environmental Management Plan (EMP) is prepared to form part of the Project execution plan for the Barrow offshore wind farm project. The EMP covers different topics such as climate and air quality, archaeology, noise and vibration, traffic and shipping, ecological assessments, water quality and waste management.  

Categories:
Archaeology
Benthic Ecology
Birds
Environmental Statements
Epifauna and Fish
Geotechnical
Marine Mammals
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1