Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2016, EGS, Zone 6 Rampion, Geotechnical Survey

2016, EGS, Zone 6 Rampion, Geotechnical Survey

Top Categories:

Geotechnical

Description

The Rampion Offshore Windfarm (ROWF) requires pre-construction geotechnical survey work to be undertaken within the offshore site, and along the Export Cable (EC) route.
     The aim of the shallow geotechnical investigation is to provide additional information at specific areas in order to enable final route engineering and to investigate proposed construction jack-up vessel positions on selected turbine locations and at the OSS.

Dataset

Download All

CPT Locations

Report

Download All

Final Results Report