2016, EGS, Zone 6 Rampion, Geotechnical Survey

2016, EGS, Zone 6 Rampion, Geotechnical Survey

Topic categories:

Geotechnical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2016 - Feb 2016

Development:

Zone 6 - Rampion

Publication date:

May 2021

Round:

3

Organisation:

EGS

Phase:

Pre-construction

Description

The Rampion Offshore Windfarm (ROWF) requires pre-construction geotechnical survey work to be undertaken within the offshore site, and along the Export Cable (EC) route.
     The aim of the shallow geotechnical investigation is to provide additional information at specific areas in order to enable final route engineering and to investigate proposed...