Summary
The Rampion Offshore Windfarm (ROWF) requires pre-construction geotechnical survey work to be undertaken within the offshore site, and along the Export Cable (EC) route. The aim of the shallow geotechnical investigation is to provide additional information at specific areas in order to enable final route engineering and to investigate proposed...