2016, EGS, Zone 6 - Rampion, Geotechnical Survey

2016, EGS, Zone 6 - Rampion, Geotechnical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

January 2016 - February 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Rampion Offshore Windfarm (ROWF) requires pre-construction geotechnical survey work to be undertaken within the offshore site, and along the Export Cable (EC) route.
     The aim of the shallow geotechnical investigation is to provide additional information at specific areas in order to enable final route engineering and to investigate proposed...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1