2012, RSK, Zone 6 - Rampion, Environmental Statement

2012, RSK, Zone 6 - Rampion, Environmental Statement

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

December 2012 - December 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

E.ON Climate & Renewables UK Rampion Offshore Wind Ltd (E.ON) is proposing
the development of the Rampion Offshore Wind Farm (‘the Project’) off the
Sussex coast. As a Nationally Significant Infrastructure Project (NSIP) under
section 14(3) of the Planning Act 2008 and, owing to the size and nature of the
project, an Environmental Impact Assess...

Categories:
Archaeology
Benthic Ecology
Birds
Epifauna and Fish
Geophysical
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
3