Summary
In June 2015 E.ON contracted EGS International Ltd (EGSi) to undertake a preconstruction geophysical and UXO survey of the wind turbine generator (WTG) locations, interarray cables (IAC) and the potential export cable (EC) routes for the Rampion offshore wind farm site. The objective of the Geophysical investigation is to provide detailed info...