2015, EGS,  Zone 6 Rampion, Geophysical Survey

2015, EGS, Zone 6 Rampion, Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2015 - October 2015

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In June 2015 E.ON contracted EGS International Ltd (EGSi) to undertake a preconstruction geophysical and UXO survey of the wind turbine generator (WTG) locations, interarray cables (IAC) and the potential export cable (EC) routes for the Rampion offshore wind farm site.
     The objective of the Geophysical investigation is to provide detailed info...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
4