Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2012, RPS, Zone  8 - Bristol Channel Atlantic Array, Ports Assessment

2012, RPS, Zone 8 - Bristol Channel Atlantic Array, Ports Assessment

Top Categories:

Shipping and Navigation

Description

As part of the third round of offshore wind farm leasing managed by The Crown Estate, RWE Npower Renewables Ltd (NRL) were awarded the rights by The Crown Estate in December 2009 to develop a 1,500 MW offshore wind farm in the Bristol Channel to be constructed between 2015 and 2018.  The project is known as the Atlantic Array.  NRL requires port facilities for the construction, operation and maintenance of the Atlantic Array for which it has commenced preliminary feasibility work to identify a short list of potential locations.  This series contains a number of  reports associated with this feasibility work.

Report

Download All

2009, SeaRoc, Zone 8 - Bristol Channel Atlantic Array, Bristol Channel Ports Assessment Report

2011, RPS, Zone 8 - Bristol Channel Atlantic Array, Ports Environmental Study (Initial Feasibility Assessment)

2011, KBR, Zone 8 - Brsitol Channel Atlantic Array, Pre-Feed Engineering Consultancy, Pembroke Dock

2010, Gifford, Zone 8 - Bristol Channel Atlantic Array, Port Assessment Report

Mojo Marine, Zone 8 - Bristol Channel Atlantic Array, Yelland Studies