2006-2009, Centrica Energy, Docking Shoal, AWAC Wave Buoy Devices

2006-2009, Centrica Energy, Docking Shoal, AWAC Wave Buoy Devices

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

March 2006 - December 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

AWAC wave buoy devices were deployed at both Docking Shoal and Race Bank Offshore Wind Farms (both Centrica Energy at the time of deployment). This Package contains the data collected from the Docking Shoal buoy. All associated reports can be found in the series reports.

Available in this series:
Datasets
1
Reports
5