Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2005, Envirolab, Barrow Offshore Wind Farm,  Soil and Water Test

2005, Envirolab, Barrow Offshore Wind Farm, Soil and Water Test

Topic categories:

Benthic Ecology

Birds

Marine Mammals

Noise

Onshore

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2005 - Jan 2005

Development:

Barrow

Publication date:

May 2021

Round:

1

Organisation:

Envirolab

Phase:

Construction

Description

This project details the collection and analysis of soil and water samples at the site of the Barrow offshore wind farm.  Envirolab carried out the analysis of the samples. For methodology details, see the BOW Construction Monitoring Report.