Summary
The work includes a seabed and a sub-seabed survey of the construction area and the export cable corridor. The main aims with the survey are to:
-Map and quantify the possibility for unexploded ordnance (UXO) within the turbine construction area and the export cable corridor.
-Acquire and interpret high quality seabed and sub-seabed data ...
