Summary
Construction began at the Dudgeon Offshore Wind Farm with the installation of monopile foundations during March 2016. The noise levels from impact piling operations were measured and reported by Gardline Environmental Ltd (2016). Measurements were taken at two locations from the piling operations at ranges of 750 m and 4 km using Autonomous Recordi...